英语翻译1.基础地基承载力远小于设计要求2.为保护K0+100右侧的古寺3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础4.对该路段进行改线设计,新线位于老线左侧,并相应增加
题目详情
英语翻译
1.基础地基承载力远小于设计要求
2.为保护K0+100右侧的古寺
3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础
4.对该路段进行改线设计,新线位于老线左侧,并相应增加涵洞及排水设施
5.圆管涵洞口边坡防护坡度和砌筑厚度不符合设计要求
6.盖板暗沟铺底厚度不符合设计要求
7.挖方段左侧排水沟浆砌片石墙身施工时,片石几何尺寸不符合要求、砂浆不饱满并且砂浆质量极差
1.基础地基承载力远小于设计要求
2.为保护K0+100右侧的古寺
3.基底软基采用抛石挤淤处理,并将原设计分离式变更为整体式基础
4.对该路段进行改线设计,新线位于老线左侧,并相应增加涵洞及排水设施
5.圆管涵洞口边坡防护坡度和砌筑厚度不符合设计要求
6.盖板暗沟铺底厚度不符合设计要求
7.挖方段左侧排水沟浆砌片石墙身施工时,片石几何尺寸不符合要求、砂浆不饱满并且砂浆质量极差
▼优质解答
答案和解析
1.The foundation foundation loading dint is farer small than a design to request
2.For protect the ancient temple of K 0+100 right sides
3.The base soft radicle adoption throws crowded Yu of stone to handle,and will design a separation type to modify into whole type foundation at first
4.Carry on changing a line design to the road's segment,the new line is located in an old line left side,and correspond to increase culvert and catchment facilities
5.The circle takes care of a culvert side ascent protection slope and carve to build thickness to not agree with to match a design request
6.Cover plank covered sewerage to spread bottom thickness to not agree with to match a design request
7.Dig a square segment left side drain when the ditch syrup carve a slice of stone wall body construction slice the stone is several what the size not agree with to match to request,the sand strach not full and the sand strach the quality differ very much
2.For protect the ancient temple of K 0+100 right sides
3.The base soft radicle adoption throws crowded Yu of stone to handle,and will design a separation type to modify into whole type foundation at first
4.Carry on changing a line design to the road's segment,the new line is located in an old line left side,and correspond to increase culvert and catchment facilities
5.The circle takes care of a culvert side ascent protection slope and carve to build thickness to not agree with to match a design request
6.Cover plank covered sewerage to spread bottom thickness to not agree with to match a design request
7.Dig a square segment left side drain when the ditch syrup carve a slice of stone wall body construction slice the stone is several what the size not agree with to match to request,the sand strach not full and the sand strach the quality differ very much
看了 英语翻译1.基础地基承载力远...的网友还看了以下:
一条抛物线的形状开口方向对称轴与抛物线y=1/2x^2相同,并且抛物线相同并且过(1,1).说明与 2020-04-07 …
已知抛物线y=-x2+mx-n的对称轴为x=-2,且与x轴只有一个交点.(1)求m,n的值;(2) 2020-06-29 …
将抛物线y=12x2先向上平移2个单位,再向左平移m(m>0)个单位,所得新抛物线经过点(-1,4 2020-07-07 …
已知:抛物线f:y=-(x-2)2+5,试写出把抛物线f向左平移2个单位后,所得的新抛物线f1的解 2020-07-08 …
在平面直角坐标系xOy中,抛物线C:y=x2+(3-m)x经过点A(-1,0).(1)求抛物线C的 2020-07-21 …
抛物线y=x2-2x+c经过点(2,1).(1)求抛物线的顶点坐标;(2)将抛物线y=x2-2x+ 2020-07-22 …
抛物线y=ax^2+bx+c沿x轴正方向移动1个单位,抛物线y=ax^2+bx+c沿x轴正方向移动 2020-07-31 …
已知一条抛物线的对称轴是x=1,该抛物线上的最低点的纵坐标是-1,并且抛物线过点(0,1),求该抛 2020-08-01 …
已知一条抛物线的对称轴是x=1,该抛物线上的最低点的纵坐标是-1,并且抛物线过点(0,1),求该抛 2020-08-01 …
抛物线y=(x-1)2的顶点A在直线l:y=x-1上运动,在某一时刻,所得新抛物线的顶点为B,记B点 2020-11-01 …