早教吧作业答案频道 -->英语-->
帮忙把汉字翻译成英文,一行中文一行英文,要对应,谢谢.要用专业语法翻译!(1)白色芯线与打磨预焊OK的DCPLUG成90度,用1到2秒时间内进行焊接作业.焊接前芯线须穿入1PCΦ3.2*6MM背胶套管.(2).不可
题目详情
帮忙把汉字翻译成英文,一行中文一行英文,要对应,谢谢.要用专业语法翻译!
(1)白色芯线与打磨预焊OK的DC PLUG成90度,用1到2秒时间内进行焊接作业.焊接前芯线须穿入 1PC Φ3.2*6MM背胶套管.
(2).不可有假焊,虚焊,铜丝分叉,胶芯烫伤,及焊接时间过长现象.
(3)线材芯线需勾焊DC之正极.
(4)焊接温度为410±30℃.
(5)保持工作台面清洁.
(6).锡点焊好后背胶套管需包住芯线锡点,不可脱落. (7). 将1PC ∮1.5*9MM的黑色套管穿在地线上面,并烘紧.
(8).不可有漏穿套管现象,铜丝不能叉出地线套管.
(9).将地线焊接在PLUG的地线预焊处.焊点需光滑
(10).自检焊接后之半成品,不可有假焊,露焊,虚焊,地线锡点过大之不良现象.
(11).焊点拉力大于7.0KG,有品管人员每2H做一次测试并填写《IPQC巡检日报表》.
(1)白色芯线与打磨预焊OK的DC PLUG成90度,用1到2秒时间内进行焊接作业.焊接前芯线须穿入 1PC Φ3.2*6MM背胶套管.
(2).不可有假焊,虚焊,铜丝分叉,胶芯烫伤,及焊接时间过长现象.
(3)线材芯线需勾焊DC之正极.
(4)焊接温度为410±30℃.
(5)保持工作台面清洁.
(6).锡点焊好后背胶套管需包住芯线锡点,不可脱落. (7). 将1PC ∮1.5*9MM的黑色套管穿在地线上面,并烘紧.
(8).不可有漏穿套管现象,铜丝不能叉出地线套管.
(9).将地线焊接在PLUG的地线预焊处.焊点需光滑
(10).自检焊接后之半成品,不可有假焊,露焊,虚焊,地线锡点过大之不良现象.
(11).焊点拉力大于7.0KG,有品管人员每2H做一次测试并填写《IPQC巡检日报表》.
▼优质解答
答案和解析
(1)白色芯线与打磨预焊OK的DC PLUG成90度,用1到2秒时间内进行焊接作业.
(1) white with grinding the difficult welding OK DC PLUG into 90 degrees, use 1 to 2 seconds for welding work.
焊接前芯线须穿入 1PC Φ3.2*6MM背胶套管.
Before welding to wear suitable into 1 PC Φ 3.2 * 6 MM back rubber casing.
(2).不可有假焊,虚焊,铜丝分叉,胶芯烫伤,及焊接时间过长现象.
(2). Not false welding, virtual welding, copper wire bifurcate, rubber core burns, and welding time too long phenomenon.
(3)线材芯线需勾焊DC之正极.
(3) wire welding of DC to hook suitable positive.
(4)焊接温度为410±30℃.
(4) the welding temperature for 410 + 30 ℃.
(5)保持工作台面清洁.
(5) keep working mesa clean.
(6).锡点焊好后背胶套管需包住芯线锡点,不可脱落.
(6). Tin welding good back glue should be suitable to cover the tin point casing, cannot come off.
(7). 将1PC ∮1.5*9MM的黑色套管穿在地线上面,并烘紧.
(7). The 1 PC for 1.5 * 9 MM wear black casing in above ground, and the tight.
(8).不可有漏穿套管现象,铜丝不能叉出地线套管.
(8). Do not wear casing leak phenomenon, copper wire can't fork out ground casing.
(9).将地线焊接在PLUG的地线预焊处.焊点需光滑
(9). Will PLUG wire welding wire in the advance in welding. Solder joints should be smooth
(10).自检焊接后之半成品,不可有假焊,露焊,虚焊,地线锡点过大之不良现象.
(10). After welding self-inspection of semi-finished products, not false welding, Lou welding, virtual welding, ground too bad phenomenon of tin point.
(11).焊点拉力大于7.0KG,有品管人员每2H做一次测试并填写《IPQC巡检日报表》.
(11). Solder joints is greater than 7.0 KG tension, have quality control personnel every 2 H do a test and fill in the IPQC inspection daily reports ".
(1) white with grinding the difficult welding OK DC PLUG into 90 degrees, use 1 to 2 seconds for welding work.
焊接前芯线须穿入 1PC Φ3.2*6MM背胶套管.
Before welding to wear suitable into 1 PC Φ 3.2 * 6 MM back rubber casing.
(2).不可有假焊,虚焊,铜丝分叉,胶芯烫伤,及焊接时间过长现象.
(2). Not false welding, virtual welding, copper wire bifurcate, rubber core burns, and welding time too long phenomenon.
(3)线材芯线需勾焊DC之正极.
(3) wire welding of DC to hook suitable positive.
(4)焊接温度为410±30℃.
(4) the welding temperature for 410 + 30 ℃.
(5)保持工作台面清洁.
(5) keep working mesa clean.
(6).锡点焊好后背胶套管需包住芯线锡点,不可脱落.
(6). Tin welding good back glue should be suitable to cover the tin point casing, cannot come off.
(7). 将1PC ∮1.5*9MM的黑色套管穿在地线上面,并烘紧.
(7). The 1 PC for 1.5 * 9 MM wear black casing in above ground, and the tight.
(8).不可有漏穿套管现象,铜丝不能叉出地线套管.
(8). Do not wear casing leak phenomenon, copper wire can't fork out ground casing.
(9).将地线焊接在PLUG的地线预焊处.焊点需光滑
(9). Will PLUG wire welding wire in the advance in welding. Solder joints should be smooth
(10).自检焊接后之半成品,不可有假焊,露焊,虚焊,地线锡点过大之不良现象.
(10). After welding self-inspection of semi-finished products, not false welding, Lou welding, virtual welding, ground too bad phenomenon of tin point.
(11).焊点拉力大于7.0KG,有品管人员每2H做一次测试并填写《IPQC巡检日报表》.
(11). Solder joints is greater than 7.0 KG tension, have quality control personnel every 2 H do a test and fill in the IPQC inspection daily reports ".
看了 帮忙把汉字翻译成英文,一行中...的网友还看了以下:
在正方体ABCD-A1B1C1D1中,O是BD1中点,A1C交平面AB1D1于M.则以下说法中:( 2020-05-17 …
下列词语中加点的字,读音全都正确的一组是A.间不容发(fā)素面朝天(cháo)色厉内荏(rěn) 2020-06-16 …
如图所示,一簇电场线的分布关于y轴对称,O是坐标原点,M、N、P、Q是以O为圆心的一个圆周上的四个 2020-07-01 …
已知在正方体ABCD-A1B1C1D1中,O是DB的中点,直线A1C交平面C1BD于点M,判断下列 2020-07-09 …
如图所示,一簇电场线的分布关于y轴对称,O是坐标原点,M、N、P、Q是以O为圆心的一个圆周上的四个 2020-07-22 …
将长度为n的单链表链接在长度为m的单链表之后的算法的时间复杂度为()A.O(1)B.O(n)C.O 2020-07-23 …
选出下面各项中字音有误的一项:A谬论mìù未雨绸缪chóumóu模型mó模具múB抹稀泥mǒ抹桌子m 2020-11-07 …
已知两个长度分别为m和n的升序链表若将它们合并为一个长度为m+n的降序链表,则最坏情况下的时间复杂度 2020-11-28 …
如图所示,一簇电场线的分布关于y轴对称,O是坐标原点,M、N、P、Q是以O为圆心的一个圆周上的四个点 2020-12-09 …
位于坐标原点处的波源竖直向上振动,经过0.5s,O、M间第一次形成如图所示的波形,则下列说法正确的是 2020-12-15 …