早教吧 育儿知识 作业答案 考试题库 百科 知识分享

-3,000mt galvanized cold coil+2,000mt hr coil-Kwangyang/Gemlik(3,000mt)+Aliga (2,000mt) Turkey-Dec 1/10th(try vsls date)-cqd Be-Frt owrs best invite pmt fio bss 1/2-Max 2 tiers for cold coil and 3 tiers hr coil-Comm 3.75% comm

题目详情
-3,000mt galvanized cold coil+2,000mt hr coil
-Kwangyang/Gemlik(3,000mt)+Aliga (2,000mt) Turkey
-Dec 1/10th(try vsls date)
-cqd Be
-Frt owrs best invite pmt fio bss 1/2
-Max 2 tiers for cold coil and 3 tiers hr coil
-Comm 3.75% comm
▼优质解答
答案和解析
首先楼主给的这两百分真的不多.
这是货盘的说明,楼主也是搞船务的?
-3,000mt galvanized cold coil+2,000mt hr coil
(HR COIL = HOT ROLLED COIL)
3000吨电镀板+2000吨热扎钢卷
-Kwangyang/Gemlik(3,000mt)+Aliga (2,000mt) Turkey
Kwangyang港卸3000吨,Aliga港卸2000吨.
-Dec 1/10th(try vsls date)
(受载期)为12月1日至10日
-cqd Be
(按照港口速度装卸)
-Frt owrs best invite pmt fio bss 1/2
Frt=FREIGHT; FIO=Free in and out spepation tuneage
船东不管装/卸/隔票/垫舱; BSS 1/2=1个装港/2个卸港
船东支付最佳运费
-Max 2 tiers for cold coil and 3 tiers hr coil
最大两列冷钢卷和三列热扎卷钢
-Comm 3.75% comm
佣金为:3.75%