早教吧作业答案频道 -->其他-->
英语翻译招标合同通用条款的一部分,别用金山软件啊!英译汉,Article15–Insuranceobligations保险职责1.IntheeventthatAnnexII.TERMSOFREFERENCE–TECHNICALSPECIFICATIONrequirestheproductstobeinsureduntilth
题目详情
英语翻译
招标合同通用条款的一部分,别用金山软件啊!英译汉,
Article 15 – Insurance obligations 保险职责
1.In the event that Annex II.TERMS OF REFERENCE – TECHNICAL SPECIFICATION requires the products to be insured until their final acceptance by the Contracting Authority,the Contractor shall be obliged to conclude a relevant insurance policy and present it forthwith to the Contracting Authority.
2.Notwithstanding the requirement of the previous paragraph,the Contractor shall be responsible for and shall indemnify,protect and/or defend the Contracting Authority from and against all losses or damage or claims of the Contracting Authority itself or of its employees or of third parties for property damage or personal injury,which arise from the execution of the Contract by the Contractor,its subcontractors or employees,provided that the Contractor has been notified of such claims or demands within thirty (30) days at the latest from the date on which the Contracting Authority has become aware of them.
招标合同通用条款的一部分,别用金山软件啊!英译汉,
Article 15 – Insurance obligations 保险职责
1.In the event that Annex II.TERMS OF REFERENCE – TECHNICAL SPECIFICATION requires the products to be insured until their final acceptance by the Contracting Authority,the Contractor shall be obliged to conclude a relevant insurance policy and present it forthwith to the Contracting Authority.
2.Notwithstanding the requirement of the previous paragraph,the Contractor shall be responsible for and shall indemnify,protect and/or defend the Contracting Authority from and against all losses or damage or claims of the Contracting Authority itself or of its employees or of third parties for property damage or personal injury,which arise from the execution of the Contract by the Contractor,its subcontractors or employees,provided that the Contractor has been notified of such claims or demands within thirty (30) days at the latest from the date on which the Contracting Authority has become aware of them.
▼优质解答
答案和解析
文章15 –保险职责
1.在附录II.职权范围–技术规格要求产品被保险直到他们的最后验收由契约授权情况下,承包商将被迫使结束一个相关的保险单和立即提出它到契约授权.
2.仍然早先段的要求,承包商将负责对和保障,保护并且/或者保卫契约授权从和反对契约授权的所有损失或损伤或者要求或它的雇员或财产损害或人身受伤的第三方,从合同的施行出现由承包商、它的转承包商或者雇员,在承包商被通报了的这样要求或在三十(30)天之内要求最迟从契约授权发觉了他们的日子条件下.
1.在附录II.职权范围–技术规格要求产品被保险直到他们的最后验收由契约授权情况下,承包商将被迫使结束一个相关的保险单和立即提出它到契约授权.
2.仍然早先段的要求,承包商将负责对和保障,保护并且/或者保卫契约授权从和反对契约授权的所有损失或损伤或者要求或它的雇员或财产损害或人身受伤的第三方,从合同的施行出现由承包商、它的转承包商或者雇员,在承包商被通报了的这样要求或在三十(30)天之内要求最迟从契约授权发觉了他们的日子条件下.
看了英语翻译招标合同通用条款的一部...的网友还看了以下:
感应电动势的应用E=n△φ/△t是感生电动势的公式,因为B的变化才出现了感应电动势,为什么不写成E= 2020-03-30 …
limn!/n^n=0 求用e-N定义证明最好详细一些 2020-05-13 …
求解lim(n,+∞>1/n*(e^1/n+e^2/n+…+e^n/n)求详细解题过程谢谢求解li 2020-05-14 …
f(x)=e^x-kx,设函数F(x)=f(x)+f(-x),求证F(1)F(2)……F(n)>[ 2020-05-21 …
矩阵(E+A)^n等于什么?看到一个二阶的矩阵n次方=E^n+n(E)^(n-1)A,三阶的n次方 2020-06-12 …
32个罗经点每个点怎么读出来?罗经中的32个罗经点(N.N/E.NNE.NE/N.NE.NE/EE 2020-06-19 …
求助:矩阵和的n次方解法比如(3E+B)^n=(3E)^n+n*(3E)^(n-1)*B(E+B) 2020-07-29 …
用C++求不超过30000E数列的最大E数的值/*数列:E(1)=E(2)=1E(n)=(n-1)* 2020-11-20 …
有一幅磁通量随时间变化的正弦图像,磁通量最大值是a(这是第一个波峰),这是时间为t1;一开始时间t0 2020-12-15 …
20分~~埃迪埃本埃根用"E"开头怎么写~~名字中有个"远"字,想用E开头取个英文名,在一个取英文名 2021-01-20 …