早教吧作业答案频道 -->英语-->
求介绍一个建筑的英语发言稿,或是文章亦可,3分钟,重点在设计上,望各位大虾鼎力相助!同学工业设计专业,设计英语课的作业,老师要求选个国内外有名的建筑,然后总结它的KEYWORD(偏向设计方
题目详情
求介绍一个建筑的英语发言稿,或是文章亦可,3分钟,重点在设计上,望各位大虾鼎力相助!
同学工业设计专业,设计英语课的作业,老师要求选个国内外有名的建筑,然后总结它的KEYWORD(偏向设计方向).文章好找,翻译困难费时,我英语也一般,找一段~
同学工业设计专业,设计英语课的作业,老师要求选个国内外有名的建筑,然后总结它的KEYWORD(偏向设计方向).文章好找,翻译困难费时,我英语也一般,找一段~
▼优质解答
答案和解析
介绍鸟巢的 请参考 很努力地找了
Beijing National Stadium (Bird's Nest/Olympic Stadium)
The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.
In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.
In depth
The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.
The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.
Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.
While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.
The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.
Beijing National Stadium
Bird's Nest/Olympic Stadium
Facility statistics
Location Beijing
Broke ground Dec 2003
Opened Unknown
Closed N/A
Demolished N/A
Owner
Surface Grass
Construction cost 3.5 billion yuan
Architect Herzog & de Meuron
ArupSport
CAG
Tenants
Seating capacity
91,000 (80,000 Post Olympics)
Beijing National Stadium (Bird's Nest/Olympic Stadium)
The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004.
In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005.
In depth
The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008.
The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens.
Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004.
While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g. to provide wind protection. Since all of the facilities -- restaurants, suites, shops and restrooms -- are all self-contained units, it is possible to do largely without a solid, enclosed facade. This allows for natural ventilation of the stadium, which is the most important aspect of the stadium's sustainable design.
The sliding roof was an integral part of the stadium structure. When it was to be closed, it would have converted the stadium into a covered arena; however, the sliding roof was eliminated in an effort to cut costs and increase overall safety of the radical new structure.
Beijing National Stadium
Bird's Nest/Olympic Stadium
Facility statistics
Location Beijing
Broke ground Dec 2003
Opened Unknown
Closed N/A
Demolished N/A
Owner
Surface Grass
Construction cost 3.5 billion yuan
Architect Herzog & de Meuron
ArupSport
CAG
Tenants
Seating capacity
91,000 (80,000 Post Olympics)
看了求介绍一个建筑的英语发言稿,或...的网友还看了以下:
一杯水放在列车内的水平桌面上如果水突然是斜向上的那列车发生的运动状态可能是什么?1列车突然向右开动 2020-05-14 …
一个圆形跑道,甲乙两人同向而行,3分20秒相遇,反向而行,40秒相遇,求跑道直径一个圆形跑道,甲乙 2020-05-14 …
AB两车分别从甲乙两地相向驶出,5小时后相遇.又按原速度原方向行3小时.这时A车距乙地135千米, 2020-05-23 …
相反,相向,相对,同向,相背.回答要求:1.表达清楚,让人一目了然.2.说明它的地点,方向是否相同 2020-06-18 …
下列句中没有通假字的一项是()(3分)A.砉然向然,奏刀騞然,莫不中音B.善哉!技盖至此乎下列句中 2020-07-10 …
A、B两地相距105千米,甲、乙两人骑车分别从A、B两地同时相向出发,甲速为40千米/小时,出发后 2020-07-13 …
甲乙两车同时从AB两地相向而行,经过5小时相遇,然后两车继续按原来方向行驶3小时,这时甲车离B还有 2020-07-18 …
一辆客车和一辆货车分别从甲乙两地相向而行,5小时后两车相遇,然后两车分别以原来的速度继续向前开,两 2020-07-18 …
1.如果向量a=(k,1),向量b=(4,k)共线且方向相反,k=2.向量OM=(3,-3),向量O 2020-12-31 …
偶然发现的求法向量的新方法求理论证明假设一个平面ABC,向量AB=(1,2,3),向量BC=(4,5 2021-01-16 …