早教吧作业答案频道 -->英语-->
英语翻译本次毕业设计是含油废水处理工艺设计.设计水量为1.5t/d.含油:1000mg/L,COD:2500mg/L,BOD:1000mg/L,氨氮:60mg/l.\x05设计采用含油污水先进行了栅渣去除后,设置平流式隔油池进行轻油的去除,并起
题目详情
英语翻译
本次毕业设计是含油废水处理工艺设计.设计水量为1.5t/d.含油:1000mg/L,COD:2500mg/L,BOD:1000mg/L,氨氮:60mg/l.
\x05设计采用含油污水先进行了栅渣去除后,设置平流式隔油池进行轻油的去除,并起到沉砂池的作用去除水中的较大的可沉降物,然后污水进入部分回流加压溶气气浮池进行水中悬浮油和细小粒度颗粒物的去除,初沉池的作用是进行水的初步沉淀,去除一部分BOD和COD,水继续进入氧化沟进行溶解油、BOD和COD的处理,最后进入接触消毒池进行消毒.污泥处理部分污泥经污泥泵打入污泥浓缩池进行污泥浓缩,进而进入贮泥池贮存,最后经脱水间脱水外运处理.出水水质:Q=15kt/d,含油:5mg/L,COD:100mg/L BOD:30mg/L,氨氮:25mg/l.
关键词:含油废水,氧化沟,气浮
本次毕业设计是含油废水处理工艺设计.设计水量为1.5t/d.含油:1000mg/L,COD:2500mg/L,BOD:1000mg/L,氨氮:60mg/l.
\x05设计采用含油污水先进行了栅渣去除后,设置平流式隔油池进行轻油的去除,并起到沉砂池的作用去除水中的较大的可沉降物,然后污水进入部分回流加压溶气气浮池进行水中悬浮油和细小粒度颗粒物的去除,初沉池的作用是进行水的初步沉淀,去除一部分BOD和COD,水继续进入氧化沟进行溶解油、BOD和COD的处理,最后进入接触消毒池进行消毒.污泥处理部分污泥经污泥泵打入污泥浓缩池进行污泥浓缩,进而进入贮泥池贮存,最后经脱水间脱水外运处理.出水水质:Q=15kt/d,含油:5mg/L,COD:100mg/L BOD:30mg/L,氨氮:25mg/l.
关键词:含油废水,氧化沟,气浮
▼优质解答
答案和解析
The graduation design is oily wastewater treatment process design. The design of water for 1.5 t/d. Oil: 1000 mg/L, COD: 2500 mg/L, BOD: 1000 mg/L, ammonia nitrogen: 60 mg/L.
Design the oily water on the first gate slag removal, set flat streaming the grease trap for light oil removal, rise to sink the role of sand pool removal of the water with larger can fall-out, then sewage into sections backflow dissolved vapor pressure gas pool for the water suspended oil floating and tiny particle size to remove the role of the pond, the first is the initial water, remove BOD and precipitation of COD, water continue on into the oxidation ditch to dissolve oil, BOD and COD processing and finally into contact disinfection pool disinfected. The sludge treatment sludge pump into the sludge of sludge concentration on sludge concentration, and pool in the mud, and finally the storage pool dehydration sinotrans processing. Between dehydration Water: Q = 15 kt/d, oil: 5 mg/L, COD: 100 mg/L BOD: 30 mg/L, ammonia nitrogen: 25 mg/L.
Keywords: oily wastewater, the oxidation ditch, floating
Design the oily water on the first gate slag removal, set flat streaming the grease trap for light oil removal, rise to sink the role of sand pool removal of the water with larger can fall-out, then sewage into sections backflow dissolved vapor pressure gas pool for the water suspended oil floating and tiny particle size to remove the role of the pond, the first is the initial water, remove BOD and precipitation of COD, water continue on into the oxidation ditch to dissolve oil, BOD and COD processing and finally into contact disinfection pool disinfected. The sludge treatment sludge pump into the sludge of sludge concentration on sludge concentration, and pool in the mud, and finally the storage pool dehydration sinotrans processing. Between dehydration Water: Q = 15 kt/d, oil: 5 mg/L, COD: 100 mg/L BOD: 30 mg/L, ammonia nitrogen: 25 mg/L.
Keywords: oily wastewater, the oxidation ditch, floating
看了 英语翻译本次毕业设计是含油废...的网友还看了以下:
求一道关于勾股定理的数学题小明的叔叔家承包了一个矩形鱼池,已知其面积为48平方米,其对角线长为10 2020-05-16 …
小明的叔叔家承包了一个矩形鱼池,已知其面积为48m2,其对角线长为10m,为建栅栏,要计算这个矩形 2020-06-10 …
某建筑安装工程,采用工料单价法计价程序计算工程造价,以直接费为计算基础,其直接工程费为1000万元 2020-06-15 …
小明的叔叔家承包了一个矩形鱼池,已知其面积为48m2,其对角线长为10m,为建栅栏,要计算这个矩形 2020-06-27 …
有一混凝土按基准配含比计算每立方的干砂为665KG,干石子1295KG,现场测的砂含水率为3%,石 2020-06-29 …
五、能量利用率计算(EMP\TCA\脂肪分解)六、蛋白质含量计算1、大多数蛋白质中氮的含量较恒定, 2020-07-03 …
[RNA和DNA的含量计算(含量,蛋白,核酸)]已知DNA的260/280值为1.8,RNA的26 2020-07-09 …
小亮父亲想用长为80m栅栏,再借助房屋的外墙围成一个矩形的羊圈,已知房屋外墙长50m,设矩形ABC 2020-07-10 …
1.小明的叔叔家承包了一个矩形鱼池,已知起面积为48平方米,其对角线长为10M,为建栅栏,要计算这 2020-07-10 …
给你一万七千多条基因序列,每条为300碱基数,要分别计算出每条的G和C含量.计算后筛选出GC含量在一 2020-12-05 …