早教吧作业答案频道 -->英语-->
英语翻译中文转为英语:斜拉桥H型索塔下塔肢由于外倾,当施工到一定高度后,下塔肢内侧砼将产生拉应力,一般两塔肢需要对拉以消除塔肢内侧根部拉应力,本文通过手工计算介绍XX长江大桥4#
题目详情
英语翻译
中文转为英语:
斜拉桥H型索塔下塔肢由于外倾,当施工到一定高度后,下塔肢内侧砼将产生拉应力,一般两塔肢需要对拉以消除塔肢内侧根部拉应力,本文通过手工计算介绍XX长江大桥4#高塔异形下塔肢对拉设计的计算思路和要点,本文介绍的方法也适用于内收型索塔进行钢管桩对撑计算,仅以此文供同行探讨.
中文转为英语:
斜拉桥H型索塔下塔肢由于外倾,当施工到一定高度后,下塔肢内侧砼将产生拉应力,一般两塔肢需要对拉以消除塔肢内侧根部拉应力,本文通过手工计算介绍XX长江大桥4#高塔异形下塔肢对拉设计的计算思路和要点,本文介绍的方法也适用于内收型索塔进行钢管桩对撑计算,仅以此文供同行探讨.
▼优质解答
答案和解析
In view of the flare-out nature of the lower tower limbs of the H-shaped tower of the cable-stayed bridge, tensile stress will be generated at the medial concrete of the lower tower limbs when its construction has reached a certain height; in order to eliminate the tensile stress at the medial base of the tower limbs,opposite pulling is generally applied to the two tower limbs. Through manual calculations, this article presents the calculating ideas and essentials of the opposite pulling design at the special-shaped lower tower limbs of the 4# high towers on the xxx Yangtze River Bridge. The method presented here is also applicable to the calculations of the symmetrical brace of steel tube piles of adduction-typed cable towers. This article is for discussions with peers only.
【英语牛人团】
【英语牛人团】
看了 英语翻译中文转为英语:斜拉桥...的网友还看了以下:
数学解三角的题2道1.一人在地面某处用测量仪测得一铁塔仰角为θ,由此处向铁塔方向前进30米,测得铁 2020-04-27 …
如图,一轮船原在A处,它的东北方向上有一灯塔P,轮船沿北偏西方向30°航行4小时到达B处,这时灯塔 2020-05-13 …
加急,谁来帮我解答一下这道物理题?从某一高塔自由落下一石子,落地后最后1s下落的高度为塔高的7/1 2020-05-20 …
在斜坡的顶部有一铁塔AB,在阳光的照射下,塔影DE留在坡面上.已知铁塔底座宽CD=14cm,塔影长 2020-05-23 …
如图,在斜坡的顶部有一铁塔AB,B是CD的中点,CD是水平的,在阳光的照射下,塔影DE留在坡面上. 2020-05-23 …
如图所示,在斜坡的顶部有一铁塔AB,B在CD中点,CD是水平的,在阳关照射下,塔影D如图,在斜坡的 2020-05-23 …
有这样一首古诗:远望巍巍塔七层,红光点点倍加增;共灯三百八十一,试算塔尖几盏灯.意思是:七层高塔, 2020-06-13 …
有一座塔,从地面到塔顶要通过塔内部的螺旋形通道上去,如图,通道的长度是420米,共转了三圈半.小明 2020-06-14 …
有一座塔,从地面到塔顶要通过塔内部的螺旋形通道上去,通道长度420M,转了3.5圈.小明从上网下, 2020-06-14 …
下列材料,结合所学知识,回答下列问题:材料一:图中,图一为大雁塔,图二为小雁塔。唐朝时,新科进士齐 2020-06-19 …