早教吧作业答案频道 -->英语-->
汉译英,务必正确关于电路接线方面的,1.接线前必须保证舱体各开关断开,接完线检查后方可通电.2.接地桩打入潮湿大地,干燥地区可加适量盐水.提示:舱shelter 接地桩ground stud 望高人翻译,
题目详情
汉译英,务必正确
关于电路接线方面的,1.接线前必须保证舱体各开关断开,接完线检查后方可通电.2.接地桩打入潮湿大地,干燥地区可加适量盐水.提示:舱shelter 接地桩ground stud 望高人翻译,
关于电路接线方面的,1.接线前必须保证舱体各开关断开,接完线检查后方可通电.2.接地桩打入潮湿大地,干燥地区可加适量盐水.提示:舱shelter 接地桩ground stud 望高人翻译,
▼优质解答
答案和解析
第一种:1.接线前必须保证舱体各开关断开,接完线检查后方可通电
Must ensure that all cabin wiring before switching off, then finished only after power-ray examination
2.接地桩打入潮湿大地,干燥地区可加适量盐水.
Earthing pile into the moist earth, dry areas may increase amount of salt water.
第二种:1.接线前必须保证舱体各开关断开,接完线检查后方可通电
Before CangTi must ensure that all wiring switch, after electrify. Rear can check line
2.接地桩打入潮湿大地,干燥地区可加适量盐水.
the pile into the wet ground, dry area can be appropriate brine.
Must ensure that all cabin wiring before switching off, then finished only after power-ray examination
2.接地桩打入潮湿大地,干燥地区可加适量盐水.
Earthing pile into the moist earth, dry areas may increase amount of salt water.
第二种:1.接线前必须保证舱体各开关断开,接完线检查后方可通电
Before CangTi must ensure that all wiring switch, after electrify. Rear can check line
2.接地桩打入潮湿大地,干燥地区可加适量盐水.
the pile into the wet ground, dry area can be appropriate brine.
看了 汉译英,务必正确关于电路接线...的网友还看了以下:
汉译英,务必正确关于电路接线方面的,1.接线前必须保证舱体各开关断开,接完线检查后方可通电.2.接 2020-05-14 …
一张铁皮长62点八厘米宽47点一厘米张师傅想用这张铁皮做侧面加工接头处忽略不计加工加工成一个无盖的 2020-05-17 …
英语的宾语中,间接宾语前面要加介词吗?间接宾语是前面加介词还是後面加加介词?间接宾语和直接宾语怎麼 2020-05-17 …
saytosb、saysb、tellsb和telltosb四个的区别那些后面加直接引语,哪些后面加 2020-05-17 …
国家统计调查、部门统计调查、地方统计调查要( )。A.明确分工B.互相衔接C.全面调查D.相互一致E 2020-05-21 …
既要进行典型调查又要进行全面调查,体现文秘调研的()。A.定性与定量的结合B.直接与间接的结合C.点 2020-05-31 …
要了解某批灯泡的平均寿命,宜采用的调查方法应为()。A.重点调查B.抽样调查C.直接调查D.全面调查 2020-06-07 …
.国家统计调查、部门统计调查、地方统计调查要( ABE )。A、明确分工B、互相衔接C、全面调查D、 2020-06-07 …
两个英语问题1checkin,请问这个词组后面能直接加名词吗?我有见到at+n也有见到直接加名词的 2020-07-17 …
英语问问lookup是不是查的意思?说他查字典怎么造句?这个查是动词吗?主语是单三动词也要单三我知道 2020-12-02 …