搭设尺寸为:立杆的横距为 1.2m,立杆的纵距为1.5m,大小横杆的步距为1.8 m;
内排架距离墙长度为0.15m;
大横杆在上,搭接在小横杆上的大横杆根数为 1 根;
The steel pipe type:Φ 48 x 3.5
横杆与立杆连接方式为单扣件;
1.1搭设方案和程序
落地脚手架搭设顺序如下(工程只能见到7层以下的脚手架搭设和实用)
⑴将地基夯实,按立杆间距放置预制砼垫块.
⑵搭设程序:摆放扫地杆→逐根立立杆与扫地杆扣紧→扫地杆小横杆与立杆及扫地杆扣紧→装第一步大横杆并与立杆扣紧→安装第一步小横杆→安装第二步大横杆→安装第三小横杆→加设临时斜撑杆(上端与第一大横杆扣紧,装设连墙杆后拆)→安装第三、四步大横杆和小横杆→连接墙杆→接立杆→加设剪刀撑→铺脚手片→扎防护栏板挡脚板,并挂设安全网防护.
⑶沿脚手架纵向两端和转角起,在脚手架外侧每隔9 M用斜面杆成剪刀撑,自上而下循序连续设置,斜面杆与地面成45-60度夹角,剪刀撑钢管接长应用搭接方法,搭接长度不小于40CM.
⑷脚手架外侧自第二步起,每步设1.2M高的防护栏杆和30CM高的挡脚板.
⑸搭设时应随搭随校正杆件的垂直和水平偏差,同时适度拧紧扣件,连接大横杆的对接扣件,开口应朝架子内侧,螺栓朝上,防止雨水进入.
⑹各杆件相交伸出的端头均要大于100MM,防止杆件滑脱.
⑺剪刀撑搭设要将一根斜扣在立杆上,另一端扣在小横杆伸出部分上,斜杆两端扣件与立杆的距离不大于200MM.
搭设尺寸为:立杆的横距为 1.2m,立杆的纵距为1.5m,大小横杆的步距为1.8 m;
内排架距离墙长度为0.15m;
大横杆在上,搭接在小横杆上的大横杆根数为 1 根;
The steel pipe type:Φ 48 x 3.5
横杆与立杆连接方式为单扣件;
1.1搭设方案和程序
落地脚手架搭设顺序如下(工程只能见到7层以下的脚手架搭设和实用)
⑴将地基夯实,按立杆间距放置预制砼垫块.
⑵搭设程序:摆放扫地杆→逐根立立杆与扫地杆扣紧→扫地杆小横杆与立杆及扫地杆扣紧→装第一步大横杆并与立杆扣紧→安装第一步小横杆→安装第二步大横杆→安装第三小横杆→加设临时斜撑杆(上端与第一大横杆扣紧,装设连墙杆后拆)→安装第三、四步大横杆和小横杆→连接墙杆→接立杆→加设剪刀撑→铺脚手片→扎防护栏板挡脚板,并挂设安全网防护.
⑶沿脚手架纵向两端和转角起,在脚手架外侧每隔9 M用斜面杆成剪刀撑,自上而下循序连续设置,斜面杆与地面成45-60度夹角,剪刀撑钢管接长应用搭接方法,搭接长度不小于40CM.
⑷脚手架外侧自第二步起,每步设1.2M高的防护栏杆和30CM高的挡脚板.
⑸搭设时应随搭随校正杆件的垂直和水平偏差,同时适度拧紧扣件,连接大横杆的对接扣件,开口应朝架子内侧,螺栓朝上,防止雨水进入.
⑹各杆件相交伸出的端头均要大于100MM,防止杆件滑脱.
⑺剪刀撑搭设要将一根斜扣在立杆上,另一端扣在小横杆伸出部分上,斜杆两端扣件与立杆的距离不大于200MM.
▼优质解答
答案和解析
Erection size:a vertical rod of the horizontal distance 1.2m,a vertical rod longitudinal distance 1.5m,size bar step distance of 1.8 m;
The inner frame distance from the wall length 0.15m;
A large bar on lap in a small bar,the bar number 1;
The steel pipe type:48 dia x 3.5
Cross rod and the vertical rod connecting mode of single fastener;
1.1 erection scheme and procedure
Landing scaffold erection sequence is as follows ( project only to see the 7 layer below the scaffolding and utility )
(1)The ground tamping,pole spacing according to the placement of prefabricated concrete cushion block.
(2)The erection procedures :placed a sweeping rod,by a vertical pole and a sweeping rod fastening,a sweeping rod small lateral pole and pole and a sweeping rod fastening to install first step large bar and rod fastening install first step,second step rail mounted a large bar install the third rail with the temporary braces ( the upper and the first major rail fastening,installing wall connecting rod after the demolition ),installed in third,four large bar and small bar,rod,connecting rod connecting wall with a scissors to spread sheet,rolling scaffold guardrail plate block feet,and set up safety net protection.
(3)The longitudinal ends along the scaffold and scaffolding outside corner,in every 9 M with inclined rod into scissors,top-down sequential setting,slant rod and ground into 45-60 degree angle,scissors pipe joint application of lap,lap length of not less than 40CM.
(4)The scaffolding outside since second steps,each step of 1.2M high protective railing and 30CM high block feet.
(5)The erection with a rod with correction of the vertical and horizontal deviation,while moderate tightening fastening,connecting rod fastener openings shall be toward the shelf,medial,bolt face,preventing entry of rain water.
(6)As the rod intersect protruding end is greater than 100MM,preventing rod slip.
(7)Scissors,erected to a slant buckle on the vertical rod,the other end button on a small rail extension,oblique rod fastener and the upright rod distance not greater than 200MM.
The inner frame distance from the wall length 0.15m;
A large bar on lap in a small bar,the bar number 1;
The steel pipe type:48 dia x 3.5
Cross rod and the vertical rod connecting mode of single fastener;
1.1 erection scheme and procedure
Landing scaffold erection sequence is as follows ( project only to see the 7 layer below the scaffolding and utility )
(1)The ground tamping,pole spacing according to the placement of prefabricated concrete cushion block.
(2)The erection procedures :placed a sweeping rod,by a vertical pole and a sweeping rod fastening,a sweeping rod small lateral pole and pole and a sweeping rod fastening to install first step large bar and rod fastening install first step,second step rail mounted a large bar install the third rail with the temporary braces ( the upper and the first major rail fastening,installing wall connecting rod after the demolition ),installed in third,four large bar and small bar,rod,connecting rod connecting wall with a scissors to spread sheet,rolling scaffold guardrail plate block feet,and set up safety net protection.
(3)The longitudinal ends along the scaffold and scaffolding outside corner,in every 9 M with inclined rod into scissors,top-down sequential setting,slant rod and ground into 45-60 degree angle,scissors pipe joint application of lap,lap length of not less than 40CM.
(4)The scaffolding outside since second steps,each step of 1.2M high protective railing and 30CM high block feet.
(5)The erection with a rod with correction of the vertical and horizontal deviation,while moderate tightening fastening,connecting rod fastener openings shall be toward the shelf,medial,bolt face,preventing entry of rain water.
(6)As the rod intersect protruding end is greater than 100MM,preventing rod slip.
(7)Scissors,erected to a slant buckle on the vertical rod,the other end button on a small rail extension,oblique rod fastener and the upright rod distance not greater than 200MM.
看了 英语翻译搭设尺寸为:立杆的横...的网友还看了以下:
我的纸箱尺寸是1.26*0.73*0.69,请问装40尺柜和40尺高柜分别能装多少?纸箱尺寸是米. 2020-04-06 …
数学题解答1.把长方形剪去一个角,它可能是什么形().2.如果课桌的高度比标准高度高2毫米,那么比 2020-04-09 …
课桌的高度比标准高度高2毫米记作+2毫米,那么比标准高度低3毫米记作什么?现有5张课桌,量得它们的 2020-04-13 …
组合正方体(抽奖箱)六面尺寸我要做的是一个亚克力的抽奖箱:1、规格:45*45cm2、亚克力厚度: 2020-07-19 …
比例尺的问题比如:实际尺寸是1米我在纸上画的尺寸是2厘米比例尺是多少比例尺的公式怎么算啊 2020-07-31 …
一幅零件图的比例尺是5比1,量的图上尺寸是1厘米,这个零件的实际尺寸是多少 2020-07-31 …
(答案是8种,但我算出来却是12种)装饰某一块长方形墙壁,尺寸12*1,现许多白色和浅蓝色壁砖,白色 2020-11-24 …
英语翻译pvc环保料反光银白亮片框架:半透明1.框架尺寸:31cmX31cmX2cm2.亮片尺寸:1 2020-11-25 …
现在有5张课桌,量得它们的尺寸比标准尺寸长:+1毫米,-1毫米,0毫米,+3毫米,-1.5毫米,若规 2020-11-28 …
(1)课桌的高度比标准高度高2毫米记作十2毫米密那么比标准高度低3毫米记做什么?(2)现有有5张课桌 2020-11-28 …