英语翻译论工程项目的工期控制摘要:建设项目工期同工程造价、工程质量一起被视为建设项目管理的三大目标,同时也是考核建设项目经济效益和社会效益的重要指标.近年来在政府对房价

题目详情
英语翻译
论工程项目的工期控制
摘要:建设项目工期同工程造价、工程质量一起被视为建设项目管理的三大目标,同时也是考核建设项目经济效益和社会效益的重要指标.近年来在政府对房价的多方调控下,节省建设工期对工程造价显的尤为重要.本文通过剖析影响项目工期的因素,结合实际情况得出了工期控制的有效手段以及项目部应合理控制工期的具体措施.工期控制是建筑项目管理中的重要组成部分,也是建筑工程项目施工过程中比较容易出现问题的环节.工期控制的顺利、科学,将会减少施工企业的资金投入,增加企业的经济效益.
关键词:工期控制;工程造价;工期;建设项目管理;经济效益
On the project schedule control
Abstract:the construction project is the project cost,project quality is regarded as the three major objectives of construction project management,but also the assessment of construction project economic benefits and social benefits of the important index.In recent years the government on the prices of various control,save construction time limit for a project to project cost is very important.This paper analyzes the influence factors of project time limit for a project,combined with the actual situation the schedule control of the effective means and project department should be reasonable control time limit for a project is specific measure.Control of time limit for a project is the construction project management important component,but also in the construction projects in the construction process more prone to problems.Control of time limit for a project smoothly,science,will be construction enterprises to reduce capital investment,increase the economic benefits of the enterprise.
Key words:project controlling; project cost; project; construction project management; economic benefits
▼优质解答
答案和解析
原文还是翻得很不错的,畋改如下:
论工程项目的工期控制
On Construction Time Limit Control of A Project
摘要:建设项目工期同工程造价、工程质量一起被视为建设项目管理的三大目标,同时也是考核建设项目经济效益和社会效益的重要指标.
Abstract:The construction time limit of a project,together with the construction costs and quality,is not only regarded as a TOP objective for the construction project management,but also an important indicator when assessing of the economic as well as the social benefits of the construction project.
近年来在政府对房价的多方调控下,节省建设工期对工程造价显的尤为重要.
To shorten the construction time limit for a project seems more critical for the construction costs particularly in the condition that the government has regulated the house pricing in many ways during the recent few years.
本文通过剖析影响项目工期的因素,结合实际情况得出了工期控制的有效手段以及项目部应合理控制工期的具体措施.
This article analyzes the influencing factors on the construction time limit for a project,and comes to a conclusion on effective control means with the actual situation combined,as well as specific proper measures that the Project Department shall take to control over the construction time limit.
工期控制是建筑项目管理中的重要组成部分,也是建筑工程项目施工过程中比较容易出现问题的环节.
Good control of construction time limit will contribute greatly to project management.At the mean while,it is also a link where problems are prone to occur during the construction.
工期控制的顺利、科学,将会减少施工企业的资金投入,增加企业的经济效益.
So whether the construction time limit can be under good control in a smooth and scientific way will have signicant impact on whether the capital input from a construction enterprise can be reduced or its economic benefits can be enhanced.
关键词:工期控制;工程造价;工期;建设项目管理;经济效益
Key words:construction time limit control; construction costs; project time limit; construction project management; economic benefits
看了 英语翻译论工程项目的工期控制...的网友还看了以下:

六爻中每一爻如何根据日建月建定旺衰?六爻卜卦时要先根据月建地支和日建地支定每爻的旺衰,和月建的关系  2020-04-25 …

请问为什么猜埃及金子塔是外星人建的啊?什么原因?是金字塔里面是古人无法做出来的?还是整个金字塔是古  2020-04-26 …

来也匆匆,去也冲冲;向前一小步,文明一大步.英语怎么说来也匆匆,去也冲冲;向前一小步,文明一大步.  2020-05-02 …

英语翻译“巴黎有一座古老的建筑——凯旋门.位于巴黎的戴高乐广场中央,是拿破仑为纪念1805年打败俄  2020-05-14 …

英语翻译欲言国之老少,请先言人之老少.老年人常思既往,少年人常思将来.惟思既往也,故生留恋心;惟思  2020-06-17 …

中文翻译成英文!很高兴收到你的来信!我叫...,是...公司的董事长!前些天给你们提供的文件中有错  2020-06-18 …

修改下列病句1.为了防止这类交通事故不再发生,我们加强了交通感全教育.2.班委会健全并建立了一系列  2020-06-18 …

晏子使楚晏子将使楚.楚王闻之,谓左右曰:“齐之习辞者也,今方来,吾欲辱之,何以也?”左右对曰:“为  2020-06-20 …

晏子使楚全文停顿.急晏子将使楚.楚王闻之,谓左右曰:“齐之习辞者也,今方来,吾欲辱之,何以也?”左  2020-06-23 …

晏子将使楚.楚王闻之,谓左右曰:“齐之习辞者也,今方来,吾欲辱之,何以也?”左右对曰:“为其来也,  2020-06-27 …