● The project life-cycle can be described as(72). (72)A.project concept, project planning,
● The project life-cycle can be described as(72).
(72)
A.project concept, project planning, project execution, and project close-out
B.project planning, work authorization, and project reporting
C.project planning, project control, project definition, WBS development, and project termination
D.project concept, project execution, and project reporting
试题(72)分析
关于项目周期划分正确的是 (72) 。
A.启动、计划、执行、收尾
B.计划、授权、报告
C.计划、控制、方案设计、WBS的发展、终止
D.启动、执行、报告
参考答案
(72)A
口算22×40=9+14=120÷6=300+400=56÷8+3=56÷7=46+24=15+1 数学 2020-04-07 …
口算57×3×0=22×22=20×5=5×8-8=92×7=513×9=125×8=72-72÷ 其他 2020-04-07 …
用简便方法计算51+34/35÷172/3×4+2/3-2/3×531又3/8×72又5/13÷3 数学 2020-04-07 …
初一正负混合计算0-|72/71-71/72|+|71/72-72/71|是绝对值不是括号 数学 2020-05-23 …
试题(72)(72)is a client/server protocol for transfer 计算机类考试 2020-05-26 …
二年级有72个同学去慰问烈军属,每8个人一组,求共分成几组?正确的解答是[]A.72÷9=8(组) 数学 2020-06-28 …
定义点P(x0,y0)到直线l:Ax+By+C=0(A2+B2≠0)的有向距离为d=Ax0+By0 其他 2020-07-09 …
用乘法交换律完成*是乘的意思1、(12+25)*4=?2、125*(80+8)=?3、(125+9 数学 2020-07-31 …
直接写出得数.72-72÷4=18×5-46=67+23×3=72+28÷4=65÷5×7=15+5 其他 2020-11-19 …
张师傅和李师傅加工零件.张师傅5小时加工72七零件,李师傅3小时加工48七零件.说出下面算式求的是什 其他 2021-01-17 …